Monday, February 20, 2017

February 2017 update

We have had a busy winter repairing and staining log homes.
We have finished about 10 homes since the end of December. The process does take a little longer as we have to enclose and heat the exterior of the log home so we can do the log repairs and staining.
This home was just finished on 2/17/17 as the house was in good condition but had some mold areas that need to be addressed. We were lucky as the weather was on our side for a change and we finished the house in about a week and half from washing to finish staining home and decks.
The decks and railings were stained and really set the log home off.
These are the before picture followed by the new stained pictures