Wednesday, February 10, 2016

The log home in Kingston Wisconsin was completed on 2/8/2016. We will be coming back in the spring to do a few more projects that couldn't be done with the enclosure around the house.
The home owner had concerns with bugs and a few drafts in the house. The logs were not caulked properly or in some cases at all which we did rectify. The home owners should be pleased with the lack of bugs and warmer home. Please see the finished pictures as the house turned out great.



Friday, February 5, 2016

The Log Home in Kingston Wisconsin is moving along on schedule even with loosing a day because of weather and bad road conditions. If all goes well we should be removing the enclosure by Monday February 8th and the home will be complete. Below are pictures of the construction in process and the first coat of stain going on the house. The home owner wanted us to check the house if it needed any additional caulk (which was on the contract). After further inspection most of the caulk had failed or was never applied originally. We did caulk the home using over 50 tubes of caulk to seal the house.