Friday, February 5, 2016

The Log Home in Kingston Wisconsin is moving along on schedule even with loosing a day because of weather and bad road conditions. If all goes well we should be removing the enclosure by Monday February 8th and the home will be complete. Below are pictures of the construction in process and the first coat of stain going on the house. The home owner wanted us to check the house if it needed any additional caulk (which was on the contract). After further inspection most of the caulk had failed or was never applied originally. We did caulk the home using over 50 tubes of caulk to seal the house.